Salt Lake City, UT Outdoor Project Forecast
Planning a weekend project in Salt Lake City? The grid below scores the next 7 days for 10 common outdoor jobs using the National Weather Service hourly forecast for Salt Lake City, Utah. Tap any day for the best time to work and what to watch out for.
Loading the latest National Weather Service forecast…
Detailed project forecasts for Salt Lake City
Stain a deck in Salt Lake CityMild temps, dry wood, and 24+ rain-free hours after.
Paint outside in Salt Lake CityHouse, fence, and trim painting without dew or rain damage.
Pour concrete in Salt Lake CityFreeze risk, hot-weather cracking, and rain on fresh slabs.
Seal a driveway in Salt Lake City50°F and rising, with 24–48 dry hours to cure.
Spray weed killer in Salt Lake CityRain-free hours, drift-safe wind, and the right temperature.
Fertilize the lawn in Salt Lake CityBest right before a light rain, never before a downpour.
Pressure wash in Salt Lake CityNo freeze-ups, manageable wind, dry days before staining.
Epoxy a garage floor in Salt Lake CityTemperature, humidity, and dew point for a cure that sticks.
Caulk outside in Salt Lake CityDry, frost-free surfaces and time to skin before rain.
Spray paint outside in Salt Lake CityHumidity, wind, and temperature for a smooth finish.
About this forecast
Forecasts are calculated for the center of Salt Lake City (40.777°, -111.931°). Conditions can differ across the metro area, especially near water, at higher elevations, or in valleys. For the most precise result, enter your own ZIP code above. The forecast refreshes every time you load the page.